Going forward into the future
Menu
Country:
Russia
City:
Moscow
Adress:
Yunikh Lenintsev St. 83 korp.4 office 5b.
background
Structure

Industrial buildings
equipment

In photos and text.
Scroll Down
29.01.2021
project

Topinambour drying shop

Part of the company's production facilities located in the Tver region of Ostashkov v. Khitino.
29.01.2021
project

Topinambour preparation

Productivity does not exceed 1,500 tons per season. Reconstruction of the room itself and replacement of the equipment is required.
29.01.2021
project

The area is 500 m.2

It is necessary to increase the area to 1200 - 1500 square meters for modern standards of production.
29.01.2021
project

Administrative Building

The manager's office, accounting department, and canteen are located there.
29.01.2021
project

Production shop

With repair shops, storage, garage for machinery.
29.01.2021
project

Courtyard

Straight ahead are the workshops. On the right are garages for storing agricultural equipment.
29.01.2021
project

Gas generator (Germany)

Maximum power 100 kilowatt/hour. Was installed in 2016.
29.01.2021
project

Coal-fired Boiler House.

It heats all shops and premises of the production complex.
29.01.2021
project

Gantry crane

Up to 5,000 kilograms.
background